Metroparks is leading efforts to restore shoreline and in-water habitat at Audubon Islands State Nature Preserve in the Maumee River between Maumee and Perrysburg. As owner of the approximately 160-acre island complex, Metroparks Toledo received $3.9 million in Great Lakes Restoration Initiative (GLRI) and Ohio EPA Section 319 grants to fund engineering, design, permitting and restoration construction on and near the island complex.
Primary Benefits are Protected and Improved Habitat for Fish and Benthos* By:
* small organisms that live on the river bottom
Click the buttons above for information presented at the public meetings (updated since the October 4, 2023 open house)
Project Team and Schedule
The Metroparks’ restoration team has strong project planning support from the Maumee Area of Concern (AOC) Advisory Committee and Ohio EPA, along with our design-build team of Verdantas and Mark Haynes Construction.
Planning and permit submittal were completed in December 2023. Construction work is planned to begin in 2025 once permits are received. A construction start date has not yet been determined.
The islands will remain a nature preserve with restricted public access.
Project Funding Dedicated to this Site is a Result of Significant Planning
This section of the Maumee River does not meet Ohio EPA standards for benthic populations, fish populations, and fish habitat. Members of the Maumee AOC Advisory Committee and its Aquatics Biological Subcommittee worked for several years and involved over 50 regional partners and experts to understand the causes of impairment and develop projects that would provide sustainable, long-term solutions to address these beneficial use impairments. After many studies and evaluations (further described below), this project was one of 54 aquatic management action projects recommended for funding by the Maumee AOC Advisory Committee and Ohio EPA, and then approved by U.S. EPA’s Great Lakes National Program Office for a GLRI funding award.
Project plans will advance the preliminary designs prepared by the U.S. Army Corps of Engineers in its 2021-2022 Feasibility Study that incorporated significant stakeholder input. Biological assessments and studies that support the need for this work include the 2019-2020 Identification of Optimal Sites for Maumee AOC Restoration Actions in the Lower Maumee River prepared by the University of Toledo and Bowling Green State University. Initial restoration concepts and analyses were presented in the 2020-2021 Lower Maumee River Restoration Design Concepts prepared by the University of Toledo, Bowling Green State University, and Hull/Verdantas. Descriptions and links to all previously completed studies and reports are in the Lower Maumee River Pre-Feasibility Studies and Lower Maumee River Project Development Feasibility Study project summaries in the Maumee AOC DMDS program.
Public Input is a Critical Component of Our Planning Efforts
Our team reached out to the community directly and through the media in advance of public open houses in July and October, 2023, to seek public input on the restoration plans. Public input helped to ensure that all factors were considered before engineering designs were completed.
For more, contact Scott Carpenter, 419-407-9726 or Scott.Carpenter@Metroparkstoledo.com